Expansion project of the existing composting plant through the construction of a new anaerobic digestion section and upgrade to biomethane and liquefaction. New line consisting of: pre-treatment and mixing section of Biowaste/ligneocellulosic waste, transfer to the anaerobic digestion, anaerobic reactors, biogas upgrade, biomethane liquefaction.
Activities: Final design, process and electromechanical works.
Location: Italy
Capacity: 52.000 t/a
In collaboration with: ETC Engineering SpA




